IBIS Macromodel Task Group Meeting date: 16 September 2008 Members (asterisk for those attending): Ambrish Varma, Cadence Design Systems Anders Ekholm, Ericsson * Arpad Muranyi, Mentor Graphics Corp. Barry Katz, SiSoft * Bob Ross, Teraspeed Consulting Group Brad Brim, Sigrity Brad Griffin, Cadence Design Systems David Banas, Xilinx Donald Telian, consultant Doug White, Cisco Systems Essaid Bensoudane, ST Microelectronics Fangyi Rao, Agilent Ganesh Narayanaswamy, ST Micro Gang Kang, Sigrity Hemant Shah, Cadence Design Systems Ian Dodd, Agilent Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics Ken Willis, Cadence Design Systems Kumar Lance Wang, Cadence Design Systems Luis Boluna, Cisco Systems * Michael Mirmak, Intel Corp. Mike LaBonte, Cisco Systems Mike Steinberger, SiSoft Mustansir Fanaswalla, Xilinx Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU * Pavani Jella, TI * Radek Biernacki, Agilent (EESof) * Randy Wolff, Micron Technology Ray Comeau, Cadence Design Systems Richard Mellitz, Intel Richard Ward, Texas Instruments Sam Chitwood, Sigrity Sanjeev Gupta, Agilent Shangli Wu, Cadence Design Systems Sid Singh, Extreme Networks Stephen Scearce, Cisco Systems Steve Pytel, Ansoft Syed Huq, Cisco Systems Syed Sadeghi, ST Micro Terry Jernberg, Cadence Design Systems Todd Westerhoff, SiSoft Vikas Gupta, Xilinx Vuk Borich, Agilent * Walter Katz, SiSoft Zhen Mu, Cadence Design Systems ----- Opens: - Review Walter's document. -------------------------- Call for patent disclosure: - No one declared a patent. ------------- Review of ARs: - David Banas report Xilinx position on LTI assumption for SerDes - No update - Arpad: Write parameter passing syntax proposal (BIRD draft) for *-AMS models in IBIS that is consistent with the parameter passing syntax of the AMI models - TBD - TBD: Propose a parameter passing syntax for the SPICE - [External ...] also? - TBD - Arpad: Review the documentation (annotation) in the macro libraries. - Deferred until a demand arises or we have nothing else to do ------------- New Discussion: 1. Finalize the IBIS-SPICE document draft to be sent to Synopsys. - Michael: Synopsys is not available for discussion for a couple of weeks. - Would like them to join this meeting or discuss offline. - Showed the document IBIS-Interconnect-Spice-mm.doc. - He added a preamble to explain the scope of the proposal. - Arpad: We might want to support encryption such as will be defined by the P1735 standard. - Michael: The document intentionally does not list a vendor specific SPICE in the assumptions section. - "Frequency-domain network parameters" was added to the scope section. - Radek: The scope should not limit the intended use of the models. - Arpad: Don Telian when working for Cadence wanted to donate K-SPICE. - Should we approach Cadence about a donation of K-SPICE again? - K-SPICE may have too many non-standard features in the controlled sources. - Walter: We should approach Synopsys first before contacting Cadence. - Michael: In the S-element section, should we include the Zo value? - Walter: Thought the value was already in the Touchstone file. - Michael: The parameter could be a check or to force a conversion from one impedance to another. - Radek: The value should come from the Touchstone file. - Michael: We'll have to study that more. Also, only S and Y are mentioned. - Michael: No B-element is included. - Walter: There is a shunt element which is an independent source, but it is the only one. We don't want any other independent elements. - Arpad: What is the next step? - Michael: He will clean up the document and discuss next week. 2. Walter showed changes to last week's presentation "Block Diagram View of EMD." - Bob: On page 1, what are the black arrows representing? - Walter: These are direct connections between blocks. - Bob: Can an EMD file be a module consisting of modules? - Walter: Yes, it can be used to wrap up an entire system. EMDs can be nested. - Arpad: Can we post this document now? - Walter: He will send it to Mike LaBonte. 3. Agenda for next week: Will review Michael's document changes. Next meeting: 23 September 2008 12:00pm PT -----------